• Location: Maida Vale, London
  • Client: Triton Building Restoration
  • Contract Duration: 28 weeks

 

SERVICES PROVIDED:

  • 44 m high masts
  • Training
  • Passenger Goods Hoists

The project involved the replacement of all the existing Crittall window units with equivalent UPVC units on an existing 16 storey residential tower block. This was a logistically complicated project including the co-ordination of 12 differing trade packages over 28 weeks. The total project value was in excess of £1.2 million.

Taylor’s Hoists carried out the erection of their hoists within a very restricted access with the minimum of disruption to both the project and the existing occupants.

This project was the first time that Triton had used large scale hoisting and they have been delighted with Taylor’s Hoists pro-active and co-operative approach.