• Location: EC3, London
  • Client: John Sisk & Sons Ltd

 

SERVICES PROVIDED:

  • Installation and operation of 650 20/32 Passenger Goods hoist
  • Removal of existing plant within a building

Taylor’s Hoists have installed a 650 20/32 Passenger Goods hoist from a raised gantry level at this refurbishment / new build office project in the centre of the City of London. After initially servicing 6 existing floors from the gantry level the hoist will be moved to service the new 7th. level from the ground. The total height is 35 metres. During this project Taylor’s Hoists assisted John Sisk & Sons by providing them with their specialist engineering services with regard to the removal of existing redundant plant within the building.